Eastern Dublin Zone 3 Potable Water Facilities

Dublin San Ramon Services District
Project Type: 
Designer: 
Black & Veatch
Contractor: 
G.S.E.
Construction Cost: 
$3.2 million

This project constructed a new 1.0 mgd potable water pump station and a 1.2 million gallon welded steel reservoir. The work also included 1,600 feet of 14-inch C900 PVC pipeline and SCADA system.

Key Project Features: 
  • Remote location with severely limited access.
  • Environmentally sensitive area with nesting Golden Eagles during multiple construction seasons.