Phase 1 Seaport Distribution System Bid Package 5

City of Redwood City
Designer: 
Kennedy/Jenks Consultants
Contractor: 
Shaw Pipeline, Inc.
Construction Cost: 
$2.1 million

The project installed 13,850 linear feet of recycled water pipeline along Seaport Seaport Boulevard, Seaport Court, Chesapeake Drive and Herkner Road including new butterfly valves, gate valves, combination air valves and blow off assemblies, appurtenances, pipe restraints, cathodic protection, zinc anodes, monument replacement, recycled water meter boxes, and all associated fittings with pavement removal, trenching in bay mud, sheeting/shoring, dewatering, connecting to pipelines, bedding, backfill, compaction backfill, and vehicular and pedestrian traffic control and safety.

Key Project Features: 
  • Working in Bay mud